Featured Insight At Cockburn Cement, our refractory lasted four years where the steel components it replaced failed every four months. Read more
Shinagawa was performing on two of three tap holes. The third moved to Shinagawa after a competitor's product was affected by a raw material change. Shinagawa has since held all three, for two years. See the project
A calciner reline scheduled around a ten-day window. The crew worked two shifts and handed the vessel back a day early, with no rework on the following inspection. See the project
Launder wear was driving an unplanned stop every quarter. A change of lining moved the replacement interval out to the annual shutdown. See the project
Reduction cell cathode linings specified with the site team, then trialled on four cells before the rollout across the potline. See the project